Skip to content

Restore public export integrity and PR controls - #6

Merged
Developer-Atlas merged 1 commit into
mainfrom
fix/p0-public-integrity-governance
Jul 22, 2026
Merged

Developer-Atlas merged 1 commit into
mainfrom
fix/p0-public-integrity-governance

Conversation

@Developer-Atlas

Copy link
Copy Markdown
Contributor

Change Contract

Human goal

Restore trustworthy public evidence integrity, prevent public/private source drift, and make the repository dogfood the Atlas control process.

Allowed paths

.github/**

config/public-export/**

content/nodes/**

docs/**

scripts/**

tests/**

package.json

CHANGELOG.md

Markdown files with pre-existing hard-break whitespace

Protected boundaries

Do not expose private monorepo source, raw feedback, personal data, credentials, or internal strategy.

Do not promote AI-assisted review to independent human certification.

Do not change Control Lite product behavior.

Keep unobserved verification marked Not run.

Parked ideas

Hosted Compendium release.

Wider browser and accessibility coverage.

Commercial or pricing work.

Evidence Record

Changed files

Review the complete GitHub Files changed tab for this pull request.

Verification results

Public boundary, links, frontmatter, 22 node/evidence pairs, and canonical manifest: Passed

Control example consistency: Passed

PR-control policy tests (4): Passed

npm test on the maintainer machine: Passed

Manual review

Public-path and rendered-document review: Not run

Public/private boundary review: Not run

AI assistance

AI materially assisted with diagnosis, implementation, validation design, patch preparation, and review preparation.

The accountable human must inspect the diff, rendered Markdown, and GitHub settings before acceptance.

Decision Record

Decision

Accept

Revise

Reject

Accountable human

Repository maintainer

Rationale

Automated P0 checks and maintainer-side npm test pass, but rendered-document review, public/private boundary review, and branch-protection configuration remain required before acceptance.

Merge confirmation

I confirm that all required checks and manual reviews above were observed as passed before merge.

@Developer-Atlas
Developer-Atlas marked this pull request as ready for review July 22, 2026 22:13
@Developer-Atlas
Developer-Atlas merged commit 92bb57a into main Jul 22, 2026
1 check passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant